London rail passengers face East Coast Main Line disruption on 28-29 November

Thameslink and Great Northern services will be affected, with rail replacement buses and coaches planned for parts of the route.

London rail passengers face East Coast Main Line disruption on 28-29 November David Kwewum

London rail passengers travelling towards Peterborough or Letchworth Garden City face a weekend of disruption on Saturday 28 and Sunday 29 November. No Thameslink or Great Northern trains will run between those destinations and London stations including Moorgate, St Pancras and King’s Cross.

The works are part of the £1.4 billion East Coast Digital Programme, which is replacing traditional signals with digital signalling in train cabs. Rail replacement services are planned, but passengers are being advised to check their journeys and allow extra time.

The closure will affect journeys from London towards both Cambridgeshire and Hertfordshire. Network Rail said passengers who can choose when to travel may wish to make their journeys on days before or after the work, which it said will be unaffected.

What passengers need to know

Most LNER services will start and finish at Peterborough rather than running through to London. Rail replacement coaches will connect passengers from Peterborough to Bedford, where Thameslink trains will run to London St Pancras.

Thameslink and Great Northern services will not run between London and Peterborough or Letchworth Garden City during the weekend. Rail replacement buses will operate on affected routes, although the full details of bus routes and timetables have not been announced in the information published.

A spokesperson for the train operators said services would be “significantly altered” and urged passengers to check before travelling. The operators did not give journey times for the replacement services.

Why the line is being closed

Network Rail said the digital signalling system is being introduced on the East Coast Main Line and will be extended to more services. It said that, when all trains use digital signalling, there should be less reliance on trackside equipment and more ability to recover from disruption.

Other engineering work on the track and lineside is also planned during the closure. Network Rail said this work is intended to improve the reliability of day-to-day services.

This report draws on information from The Comet.

Editorial checks passed Facts, figures and quotes checked against 1 source

Add News Post as a preferred source on Google

Related stories